Would you like to contact SERFIM or one of its companies?
ContactProject description:
- Treatment of concentrated pollution points (hydrocarbons and chlorinated solvents);
- Retaining work (installation of a pile wall);
- Nuisance management (installation of a tent and an air treatment system);
- Pumping and treatment of downhole water;
- Earthworks, stockpiling, sorting, treatment (liming of soil and chemical oxidation of the excavation bottom), disposal or reuse as backfill of materials from the site.
Key figures :
- Earthworks of 2500m3;
- 1,500 T of non-inert excavated material disposed of;
- 2,200 T of materials reused on site;
- Installation of an 1,800m² tent;
- 700m3 of water pumped and treated on site.