Rehabilitation of an industrial area

Project Description:
– Treatment of concentrated pollution hotspots (hydrocarbons and chlorinated solvents);

– Shoring work (installation of a pile wall);

– Nuisance management (assembly of a tent and an air treatment system);

– Pumping and treatment of excavation bottom water;

– Earthmoving, stockpiling, sorting, treatment (liming of soils and chemical oxidation of the excavation bottom), removal or reuse as backfill of materials from the site.

Key Figures:

– Earthmoving of 2,500 m3;

– 1,500 tonnes of non-inert excavated soil removed to approved facilities;

– 2,200 tonnes of materials reused on site;

– Installation of an 1,800 m² tent;

– 700 m3 of water pumped and treated on site.